Skip to content

New package: mopidy-iris-3.70.0#57081

Open
iceaway wants to merge 1 commit intovoid-linux:masterfrom
iceaway:new/mopidy-iris
Open

New package: mopidy-iris-3.70.0#57081
iceaway wants to merge 1 commit intovoid-linux:masterfrom
iceaway:new/mopidy-iris

Conversation

@iceaway
Copy link
Copy Markdown
Contributor

@iceaway iceaway commented Sep 10, 2025

Testing the changes

  • I tested the changes in this PR: YES

New package

Local build testing

  • I built this PR locally for my native architecture, (x86_64-glibc)

@tranzystorekk tranzystorekk added the new-package This PR adds a new package label Sep 11, 2025
@github-actions
Copy link
Copy Markdown

Pull Requests become stale 90 days after last activity and are closed 14 days after that. If this pull request is still relevant bump it or assign it.

@github-actions github-actions bot added the Stale label Dec 11, 2025
@iceaway
Copy link
Copy Markdown
Contributor Author

iceaway commented Dec 11, 2025

bump

@github-actions github-actions bot removed the Stale label Dec 12, 2025
@github-actions
Copy link
Copy Markdown

Pull Requests become stale 90 days after last activity and are closed 14 days after that. If this pull request is still relevant bump it or assign it.

@github-actions github-actions bot added the Stale label Mar 12, 2026
@github-actions github-actions bot removed the Stale label Mar 14, 2026
@iceaway iceaway force-pushed the new/mopidy-iris branch 2 times, most recently from 99c4b9a to a80a908 Compare March 26, 2026 09:29
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

new-package This PR adds a new package

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants