Vectorize the draw-wise predictive variance of the Gaussian and Student-t - #575

Open
avehtari wants to merge 2 commits into
masterfrom
vectorize-predvar
Open

avehtari wants to merge 2 commits into
masterfrom
vectorize-predvar

Conversation

@avehtari

Copy link
Copy Markdown
Member

Summary

This PR computes the predictive variance of the reference model for the Gaussian and Student-t families with two matrix products instead of one R-level weighted.mean() call per observation. project() with 10 000 observations and 4 000 projected draws gets about 7 times faster. For small numbers of observations, the run time does not change. The results do not change.

This PR was assisted by Claude.

Overhead

predvar_gauss() and predvar_student_t() compute, for each observation, the weighted variance of mu across the draws with one weighted.mean() call per observation. get_refdist() calls family$predvar() once per projected draw, and get_p_clust() once per cluster, so a projection with S draws makes n × S R-level calls. In a profile of project() for a Gaussian model with n = 10 000 and 4 000 projected draws, get_refdist() took 88 % of the time, nearly all in weighted.mean().

Changes

  • The new internal rowvar_wdraws() computes the same weighted variances for all observations with two matrix products.
  • predvar_gauss() and predvar_student_t() use it. predvar_gamma() does not compute a variance, so it does not change.

Results

For random inputs (one draw, 400 draws, unequal weights, missing values), the largest relative difference to the old code is 1.1e-15, with the same missing values. For one draw, the variance term is exactly 0, as before. One call with n = 10 000 and one draw takes 0.05 ms instead of 34 ms.

Gaussian reference model with P = 50 and 4 000 draws; all results identical to master (largest relative difference 1.6e-16, identical rankings):

case master this PR
project(), n = 10 000, 4 000 projected draws 239 s 33 s
project(), n = 50 000, 400 projected draws 114 s 11 s
project(), n = 1 000, 4 000 projected draws 29 s 14 s
varsel(), n = 10 000, 400 projected draws 122 s 99 s

For small n (N = 50, P = 200), the run time does not change.

Tests

The new test_predvar.R checks that:

  • rowvar_wdraws() equals the row-wise weighted variance of the old code, for unequal and equal weights; that it gives exactly 0 for one draw; and that a missing value gives a missing variance for its observation only;
  • predvar() of the extended gaussian() and Student_t() families equals the weighted mean of the squared dispersion (times nu / (nu - 2) for Student-t) plus the weighted variance of mu.

The first test fails on master (function not found). The second test passes on master and on this branch; it checks that the change keeps the results. The full suite passes with NOT_CRAN=true: 255 tests, 55 813 expectations, 0 failures, the same 4 warnings as master. Tested with this change applied to master 73cf0ee (projpred 2.11.0.9000), R 4.6.1, brms 2.23.0, rstanarm 2.32.2, cmdstanr 0.9.0.9001, CmdStan 2.39.0, on CSC Roihu (Linux, AMD EPYC).

Formula

For the draws $s$ in one cluster (or one projected draw), with weights $w_s$ normalized to $\sum_s w_s = 1$, means $\mu_{is}$ and dispersions $\sigma_s$, the predictive variance of observation $i$ is

$$ v_i = c \sum_s w_s \sigma_s^2 + \sum_s w_s \left(\mu_{is} - \bar{\mu}_i\right)^2 , \qquad \bar{\mu}_i = \sum_s w_s \mu_{is} , $$

with $c = 1$ for the Gaussian family and $c = \nu / (\nu - 2)$ for the Student-t family. The first term is the same for all $i$.

Master

for i in 1..n:
  v_mu[i] <- sum(w * (mu[i, ] - weighted.mean(mu[i, ], w))^2)

get_refdist() calls predvar() once per projected draw, and get_p_clust() once per cluster. So one projection makes $n \cdot S$ R-level calls of weighted.mean(). For $n = 10000$ and $S = 4000$, these are $4 \cdot 10^7$ calls.

This PR

With $M$ the $n \times S_c$ matrix of $\mu_{is}$ for the $S_c$ draws in the cluster and $w$ the weight vector:

$$ \bar{\mu} = M w , \qquad v^{\mu} = \left( (M - \bar{\mu} \mathbf{1}^\top) \circ (M - \bar{\mu} \mathbf{1}^\top) \right) w , $$

where $\circ$ is the elementwise product. These are two matrix-vector products with $O(n S_c)$ operations, as in master, but in compiled code.

mu_mean <- drop(mu %*% w)
v_mu    <- drop(((mu - mu_mean)^2) %*% w)   # mu - mu_mean recycles down columns

For one draw ($S_c = 1$, $w = 1$), $v^{\mu} = 0$ exactly. A missing $\mu_{is}$ gives a missing $v_i$, as in master.

@avehtari avehtari added the performance Performance issues (i.e., high runtime or high memory usage). label Oct 24, 2026
@avehtari
avehtari requested a review from aloctavodia October 24, 2026 12:28

This branch has not been deployed

No deployments
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

performance Performance issues (i.e., high runtime or high memory usage).

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant