Skip to content

quest: move m0-m2 quests that need not block 0.22.0 to m3 - #9842

Merged
kixelated merged 4 commits into
mainfrom
quest-plan/punt-to-m3
Nov 28, 2026
Merged

kixelated merged 4 commits into
mainfrom
quest-plan/punt-to-m3

Conversation

@kixelated

@kixelated kixelated commented Nov 28, 2026 •

Copy link
Copy Markdown
Collaborator

Applies the maintainer's 2026-11-28 decision (/quest-run): m0 to m2 focus on the lite-07 freeze and the 0.22.0 cut. A quest stays in m0 to m2 only when (a) the cut's ## Required (all of m2, rind-adapters, the interop-green and nightly epics) or lite07-finalize needs it, directly or transitively, or (b) it makes a semver-breaking API or wire change. Every other quest moves to m3 and ships later in a patch version. The questline (quest/README.md) now states the rule that applies until the cut: m0 holds the cut's operational blockers, m1 holds only claimed in-flight work, m2 holds the breaking changes plus non-breaking work the cut or lite-07 needs, and everything else goes to m3. The m0 to m3 READMEs each record the decision in a short line that links to the questline, along with their own moves and new Goal.

Claimed quests stay put

quest mv refuses to move a quest that has a claim branch or an open PR, "since the old branch would no longer name it." The brief said to move claimed quests anyway unless quest's own rules said otherwise. The tool is quest's rule, so I followed it. A move done by hand would also leave the new path looking unclaimed, so another agent could start the same work again. Each claimed quest that would otherwise move is in the table below as kept (claimed). It lands with its PR. If that PR leaves work, the remainder moves to m3 with quest mv once the claim ends. The m0 and m1 READMEs say this.

So none of the roughly 17 in-flight m1 PRs has to follow a move. The only open PRs touching files this PR edits are link and README edits:

Moved (14)

From To Why it can move
quest/m1/audit-instructions.md quest/m3/audit-instructions.md recurring audit; the other audits already sit in m3
quest/m1/front-drop-with-next-group.md quest/m3/front-drop-with-next-group.md reader bug fix, no API break; requires m1's relayed-refused-fill-gap, an earlier milestone
quest/m1/go-module-proxy.md quest/m3/go-module-proxy.md distribution infra; the cut doesn't require it
quest/m1/mediacodec-resume-after-flush.md quest/m3/mediacodec-resume-after-flush.md encoder bug fix
quest/m1/owed-group-pass-over.md quest/m3/owed-group-pass-over.md Public API: none. Wire: none
quest/m1/quic-ack-packing-and-pto-duplication.md quest/m3/quic-ack-packing-and-pto-duplication.md additive fields on #[non_exhaustive] transport::Config
quest/m1/quic-path-return.md quest/m3/quic-path-return.md Public API: none. Wire: none
quest/m1/split-moq-net-tests.md quest/m3/split-moq-net-tests.md test layout; no API or behavior change
quest/m1/tracks-limit.md quest/m3/tracks-limit.md one new field on #[non_exhaustive] session::Limits
quest/m1/ts-unpadded-audio-buffer.md quest/m3/ts-unpadded-audio-buffer.md TS export fix
quest/m1/vr-demo-try.md quest/m3/vr-demo-try.md demo trial
quest/m0/js-listing-synced-order.md quest/m3/js-listing-synced-order.md JS listing bug fix plus doc wording for SYNCED; no wire change
quest/m0/release-attest-backport.md quest/m3/release-attest-backport.md release-line backport waiting on #9780; it is patch work by definition
quest/m2/hls-group-end-timing.md quest/m3/hls-group-end-timing.md rechecks HLS timing after lite-07 is finalized; changes no API. Still requires lite07-finalize (m2)

Kept

Quest Criterion
quest/m0/rind-adapters.md (a) in the cut's Required (claimed by #8432)
quest/m0/interop-green/README.md (a) in the cut's Required
quest/m0/nightly/README.md, audio-bursty-regression.md, resume-route-mutants.md (a) the cut's Required epic and its children (audio-bursty-regression claimed by #9783)
quest/m0/test-flakes-5/README.md, finish-go-row-under-load.md, gst-finish-late-tail.md, js-native-finish-reader-exit.md unsure, kept: interop finish-lane flakes. gst-finish-late-tail already failed a scheduled Interop run, which is the run the cut's release gate uses. They aren't children of interop-green, but they serve its goal (finish-go-row-under-load claimed by #9810)
quest/m0/ci/README.md, mbx-b2.md, mbx-b2-verify.md, nix-nar-stream.md, retire-infra-nix.md kept (claimed): they would move. mbx-b2 is claimed by #9837, so quest mv refuses to move the epic directory. Moving only the other children into quest/m3/ci/ fails quest check, which needs a README there. mbx-b2-verify is blocked behind mbx-b2 anyway, and nix-nar-stream is scheduled for 2026-12-03
quest/m0/repeatable-instruction-counts.md kept (claimed), #9574
quest/m1/audio-group-bindings.md kept (claimed), #9823
quest/m1/chat-startup-loss.md kept (claimed), #9825
quest/m1/created-first-group-relay-parity.md kept (claimed), #9826
quest/m1/health-consumers.md kept (claimed), #9822
quest/m1/idle-conn-memory/README.md kept (claimed): all four children are claimed (auth-state #9828, event-channel #9834, quic-state #9827, session-futures #9832)
quest/m1/js-data-errors-stay-on-their-track.md kept (claimed), #9829
quest/m1/lite07-link-starve.md kept (claimed), #9831. It would also be unsure: a lite-07 stall whose fix may need a lite-07-wip wire change, which the quest says joins m2
quest/m1/relayed-refused-fill-gap.md kept (claimed), #9830
quest/m1/stale-route-demotion.md kept (claimed), #9838
quest/m1/stats-aggregate-fixes.md kept (claimed), #9835
quest/m1/steady-broadcast-growth.md kept (claimed), #9579
quest/m1/ts-export-audio-rate.md kept (claimed), #9839
quest/m1/verify-resume-failover-sync.md kept (claimed), #9836
quest/m1/video-rate/README.md, windows.md kept (claimed): windows is claimed by #9715, which pins the epic
quest/m2/lite07-finalize.md (a) lite-07 finalization itself; (b) wire
quest/m2/lite07-subscribe/README.md, per-range-policy.md (a) lite07-finalize requires it; (b) breaking API and wire (per-range-policy claimed by #9719)
quest/m2/timestamp-ids.md (a) lite07-finalize requires it; (b) wire (claimed by #9794)
quest/m2/group-frame-timestamps.md (a) lite07-finalize requires it; (b) breaking API and wire
quest/m2/delete-moq-pattern.md (b) removes public crates and API (claimed by #9800)
quest/m2/typed-superseded-group-end.md kept (claimed), #9808. It is additive (Error::superseded()), so it would otherwise move

Choices made without asking

  • Criterion (a) literally lists "all of m2", which would keep every m2 quest. I read it as "the cut waits on m2 as this decision re-scopes it", so m2 quests were judged by lite-07 and breaking changes, and hls-group-end-timing moved.
  • Claimed quests stay put because quest mv refuses them (see above). This differs from the brief's "move them anyway".
  • The ci epic stays whole instead of being split across milestones. Once fix(ci): cache writers check out history so a new Cargo.lock's manifest is seeded #9837 merges, quest mv quest/m0/ci quest/m3/ci moves it.
  • audit-instructions now requires the release cut instead of m0, matching the other audits in m3, so it can't start before the cut.
  • I updated two moved quests' plans whose own text said "joins m1" or "in m1" (quic-ack-packing, split-moq-net-tests), plus one prose path that quest mv reported.

Validation

  • quest mv ran quest check after each move, and each passed.
  • quest check on the head: 573 documents ok.
  • git grep finds no remaining mention of any moved quest's old path.
  • just check passes on the head.
  • /quest-review: three rounds (gpt-6.2-sol xhigh and claude-opus-5-5 medium). Round 1 found that the questline and m1's Goal still stated the old rules; both were fixed. Round 3 scored 10 from both reviewers with no findings. One note was left: the split-fix line could also defer to m0 for operational blockers.

Models

  • Size: M
  • Implementer: Claude Code, claude-opus-5-5, unknown

Public API: none. Wire: none.

🤖 Generated with Claude Code

(Written by Claude Opus 5.5)

@kixelated
kixelated marked this pull request as ready for review November 28, 2026 08:13
@kixelated
kixelated added this pull request to the merge queue Nov 28, 2026
Merged via the queue into main with commit 47dda97 Nov 28, 2026
4 of 5 checks passed
@kixelated
kixelated deleted the quest-plan/punt-to-m3 branch November 28, 2026 08:18
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant