Repository navigation
fix(ci): Check out the PR base commit before planning affected projects - #26922
Merged
Merged
Conversation
Co-Authored-By: Rola Abuhasna <rola.abuhasna@sentry.io>
Contributor
size-limit report 📦Compared: 8bb405b (PR test merge using develop at b47034c) Against: b47034c (develop) · base run #68096 ✅ Baseline matches: this diff contains only this PR's changes.
|
Contributor
Optional E2E testsAll optional checks were successful. 65 successful. See the run. Successful checks
|
nicohrubec
approved these changes
Nov 26, 2026
51 tasks done
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
What
Plan CI jobschecks out the PR base commit again before it computes affected Nx projects. It stops failing withfatal: bad object <base.sha>.Why
#26889 moved planning into
ci-planning.yml, and the base-commit checkout from the old test-matrix job didn't come along. The job now fetches only the merge commit at depth 2, so the affected-projects diff can't find the base for any PR whose merge-base isn't the currentdeveloptip. That's most PRs oncedevelopmoves, for example #26904. This brings back the same step the other jobs inbuild.ymlstill use.via Rola Abuhasna.
--
View Session [Sentry]