Skip to content
Merged
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
4 changes: 3 additions & 1 deletion docs/doperpowers/specs/2026-11-24-ticket-board-design.md
Original file line number Diff line number Diff line change
Expand Up @@ -24,7 +24,7 @@ This unit gives the whole picture its data (who holds what, and tickets that poi
- [x] (2026-11-27) The whole-branch review of M1 to M3, `doperpowers:reviewer-high` over `40b79a7d1..ec7bf68e5`: twenty findings, eleven fixed in `514c65726` and `9a9f7278d`, six more from its re-review in `b6a6a0288`, a third read with no material finding. Dismissed and deferred findings are in the pull request's Unresolved Review Findings. Suite 235/235.
- [x] (2026-11-27) R14 built: `task create` without a category or a priority, and `task claim` of a ticket registered for another thread (`task` 0.2.0).
- [x] (2026-11-28) M4's first pull request, what sessions read: the `task:tickets` skill; the old skill's head sentence, the old scripts' two refusals and the board lines of `execspec`, `decomposing` and `organizing-sprints`; the install line and the catalog. Acceptance 20 is in the `issue-tracker` and `board-api` gates. Acceptance 29: 65 counted sessions on Opus at high effort, their results under M4's *As built*. The sminos skill is left as it is (there too). The flip is the second pull request.
- [ ] M4 — the skill, the calling skills, and this repository's cutover.
- [x] (2026-11-28) M4 — the skill, the calling skills, and this repository's cutover. What sessions read in #670 (task 0.5.0, doperpowers 7.230.0); the flip in #671; the relabel applied the same day. The owner ruled that M4 not wait on #646 ("646은 지금 당장 머지되지 않는다 -- M4로 그냥 바로 진행하도록").
- [ ] M5 — the sibling repositories' cutover.
- [ ] M6 — sminos calls the board at a thread's start, `/clear` and end.
- [ ] M7 — the old scripts retire; the final verification.
Expand Down Expand Up @@ -630,6 +630,8 @@ After M6's release is on a machine where the plugin is enabled (run by the sessi

**Proves:** 20 on the first pull request's branch; 27 to 29, and 30 for this repository.

*As built, the flip* (2026-11-28): both of the owner's Macs ran task 0.5.0 and doperpowers 7.230.0 before it merged, and a fresh session listed `task:tickets` (acceptance 30). The plan read 60 open issues: 37 mechanical rows and 23 decisions, which the owner approved as recommended in a table ("추천대로 적용한다"; the table is #671's description). The project's sessions were told through sminos before the merge. After it, every clone of this repository on the two Macs (one on the MacBook, eight on the mini) was fetched and showed the flip. `task migrate apply` relabelled 60 and rewrote 25 bodies in 202 writes, with none skipped or failed and no old status label left (receipt 27). `task lint` ended with 0 FAIL and 1 WARN: #563 is `planned` with no blocker, as the approved table had it, since the MAWS work it waits on has no ticket yet. From a linked worktree on the commit before the flip, both that branch's old scripts and the installed ones refused with the moved-board line (receipt 28). #530 was closed as completed and #605 and #609 as not planned, as the table said. One ticket was in flight (#310, `status:in-design`), and no live session held it. O4's ticket for MAWS is #672.

### M5 — the sibling repositories' cutover

**At its end:** `cua`, `MAWS` and `arkho` are on `task`, each by one pull request in that repository and one applied plan.
Expand Down