Skip to content

Latest commit

 

History

History
61 lines (45 loc) · 1.37 KB

File metadata and controls

61 lines (45 loc) · 1.37 KB

EVY Implementation Readiness Checklist

Pre-Implementation Checklist

Purpose

Use this checklist to verify readiness before starting implementation. Check off each item as completed.


Pre-Implementation Checklist

Documentation

  • Master Implementation Plan reviewed
  • Technical Specifications reviewed
  • Testing Plan reviewed
  • Deployment Runbook reviewed
  • API Documentation reviewed

Hardware

  • Raspberry Pi 4 (8GB) procured
  • GSM HAT procured
  • LoRa HAT procured
  • Solar power system procured
  • Hardware validation plan ready

Software

  • Development environment setup
  • Rust toolchain installed
  • Python 3.11 installed
  • Docker installed
  • Git repository cloned

Team

  • Development team assigned
  • Roles and responsibilities defined
  • Communication channels established
  • Project management tool setup

Planning

  • Sprint planning completed
  • Milestones defined
  • Dependencies identified
  • Risk mitigation plans ready

Testing

  • Test infrastructure ready
  • Test data prepared
  • Hardware test environment ready
  • CI/CD pipeline planned

🚦 Ready to Start?

If all items checked: ✅ READY TO START IMPLEMENTATION

If items missing: Address missing items before starting


END OF CHECKLIST