chore(deps-dev): bump yarl from 1.20.1 to 1.24.2 #1786
build.yml
on: pull_request
Matrix: build
check-build-matrix
2s
Annotations
9 errors
|
build (3.11)
Process completed with exit code 1.
|
|
build (3.13)
The strategy configuration was canceled because "build._3_11" failed
|
|
build (3.13)
Process completed with exit code 1.
|
|
build (3.12)
The strategy configuration was canceled because "build._3_11" failed
|
|
build (3.12)
Process completed with exit code 1.
|
|
build (3.14)
The strategy configuration was canceled because "build._3_11" failed
|
|
build (3.14)
Process completed with exit code 1.
|
|
build (3.10)
The strategy configuration was canceled because "build._3_11" failed
|
|
check-build-matrix
Process completed with exit code 1.
|