Objective
Establish a monthly workshop cadence to continuously stress test the platform with real user load, surface optimization opportunities, and validate architectural changes.
Context
The Sept 30 workshop revealed issues that weren't caught during internal testing. Regular workshops with both internal and external users will help catch problems early and drive continuous improvement.
Requirements
Workshop Planning
Infrastructure Preparation
Documentation
Success Criteria
- Monthly workshop scheduled and executed consistently
- Each workshop has 10+ concurrent users
- Issues discovered during workshops are tracked and addressed before next workshop
- Month-over-month improvement in stability metrics
- Zero critical incidents (data loss, prolonged downtime) during workshops
Related
Sept 30 Workshop Postmortem
Objective
Establish a monthly workshop cadence to continuously stress test the platform with real user load, surface optimization opportunities, and validate architectural changes.
Context
The Sept 30 workshop revealed issues that weren't caught during internal testing. Regular workshops with both internal and external users will help catch problems early and drive continuous improvement.
Requirements
Workshop Planning
Infrastructure Preparation
Documentation
Success Criteria
Related
Sept 30 Workshop Postmortem