From 312df87964f0d0594d2ad7b36c6079752e77760b Mon Sep 17 00:00:00 2001 From: TheMeinerLP Date: Sat, 21 Nov 2026 15:58:57 +0100 Subject: [PATCH] docs(openspec): tick finished tasks of add-release-branches-and-backports The end of life job is merged and its verify step is met: the date decision has tests, and the job does nothing before a window ends. The jobs of groups 6, 8, 9 and 11 are merged too, but each verify step asks for a rehearsal on a throwaway repository that has not been run, so those tasks stay open, as do the spike, the note on #22 and the pull request series task. Signed-off-by: TheMeinerLP --- openspec/changes/add-release-branches-and-backports/tasks.md | 2 +- 1 file changed, 1 insertion(+), 1 deletion(-) diff --git a/openspec/changes/add-release-branches-and-backports/tasks.md b/openspec/changes/add-release-branches-and-backports/tasks.md index 9c3fb532f8..44215ad610 100644 --- a/openspec/changes/add-release-branches-and-backports/tasks.md +++ b/openspec/changes/add-release-branches-and-backports/tasks.md @@ -94,7 +94,7 @@ builds and passes on its own. ## 12. End of a window -- [ ] 12.1 `ci(release)`: a `schedule` job in `release-please.yml` that reads the end of life dates from `support-lines.json`, with the +- [x] 12.1 `ci(release)`: a `schedule` job in `release-please.yml` that reads the end of life dates from `support-lines.json`, with the date passed in as a parameter, opens the archiving pull request, and renames the branch to `archive/.x` once that pull request is merged. Verify: the tests for the date decision pass, and the job changes nothing before the end of life date.